MIL-PRF-24792A
4.5.1 Group A inspection. Group A inspection shall consist of the
tests listed in table IV, conducted in the order shown.
TABLE IV.
Group A inspection.
Inspection
Requirement
Test
Identification and
3.4.14
4.6.12
marking
4.5.1.1 Sampling plan. Group A inspections shall be performed on 100
percent of the product supplied under this specification.
4.5.1.2 Failures. One or more failures shall constitute group A
inspection failure of the sample unit.
4.5.1.3 Disposition of sample units. Samples that have failed group A
inspection shall not be shipped or submitted for group B testing.
4.5.2 Group B inspection. Group B inspection shall consist of the
tests listed in table V, conducted in the order shown. Group B inspections
shall be made on sample units that have passed group A inspection.
TABLE V.
Group B inspection.
Inspection
Requirement
Test
Workmanship
3.4.15
4.6.13
Cure schedule
3.4.5
4.6.4
Hardness
3.4.7
4.6.6
Bond strength
3.4.8
4.6.7
4.5.2.1 Sampling plan. A minimum of three sample units shall be
selected from each lot of material supplied under this specification.
4.5.2.2 Failures. One or more failures shall constitute group B
inspection failure of the lot.
4.5.2.3 Rejected lots. Requirements regarding the rework of rejected
lots shall be as identified in the contract (see 6.8.1).
4.5.2.4 Disposition of sample units. Samples that have failed group B
inspection shall not be shipped or submitted for group C testing.
4.5.3 Periodic inspection. Periodic inspection shall consist of group
C inspection. Except where the results of these inspections show
noncompliance with the applicable test requirements (see 4.5.3.1.4), delivery
of products which have passed group B shall not be delayed pending the results
of these first article verification inspections.
4.5.3.1 Group C inspection. Group C inspection shall consist of the
inspections specified in table VI, in the order shown. Group C inspections
shall be made on units that have passed the group B inspection.
4.5.3.1.1 Sampling plan. Every 60 months, a number of units of the
same PIN, sufficient to complete all of the inspections, which have passed
group B inspection, shall be selected.
4.5.3.1.2 Failures. One or more specimen or sample unit failures shall
constitute group C inspection failure.
7
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business