MIL-PRF-24792A
6.8.2 Noncompliance. If a sample fails to pass group C inspection, the
contractor must do the following:
a.
Notify the contracting activity of the failure.
b.
Take corrective action on the materials and processes as
warranted.
c.
Take corrective action on all units of the product which
(1)
Can be corrected,
(2)
Were manufactured under essentially the same conditions, with
essentially the same materials and processes, and
(3)
Are considered subject to the same failure.
Acceptance of the product will be discontinued until corrective action,
acceptable to the contracting activity has been taken. After the corrective
action has been taken, group C inspection must be repeated on additional
sample units (all inspection tests or the inspection test which the original
sample failed, at the option of the contracting activity). Group A and group
B inspections may be reinstituted; however, final acceptance will be withheld
until the group C inspection has shown that the corrective action was
successful.
6.9
Subject term (key word) listing.
Bonding optical fibers
Connectors
Cured adhesive components
Epoxy adhesive
Shelf life
Custodians:
Preparing Activity:
Army - CR
Navy SH
Navy SH
NASA NA
Agent:
DLA CC
Review activities:
(Project 6070-0003)
Army MI
Navy - AS
Air Force 13, 19, 33, 85, 90, 93, 99
DLA - CC
12
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business