MIL-PRF-24792A
TABLE III.
First article inspection.
Inspection
Requirement
Test
Sample size
Identification and
3.4.14
4.6.12
All units
marking
Workmanship
3.4.15
4.6.13
All units
Viscosity
3.4.1
4.6.1
1/
Shelf life
3.4.2
4.6.2
2/
Storage temperature
3.4.3
4.6.2
3/
Pot life
3.4.4
4.6.3
1/
Cure schedule
3.4.5
4.6.4
4/
Linear shrinkage
3.4.6
4.6.5
5/
Hardness
3.4.7
4.6.6
5/
Bond strength
3.4.8
4.6.7
5/
Glass transition
3.4.9
4.6.8
5/
temperature
Coefficient of linear
3.4.11
4.6.10
5/
thermal expansion
Temperature
3.4.12
4.6.10
6/
Outgassing
3.4.17
4.6.15
1/
1/ Three specimens shall be used from units selected at random from the first
article sample.
2/ Twelve specimens shall be used from units selected at random from the
first article sample.
3/ The same specimens shall be used as are used in the shelf life
inspection.
4/ Fifteen specimens shall be used from units selected at random from the
first article sample.
5/ Three specimens shall be used selected from the specimens used in the cure
schedule inspection.
6/ The same specimens shall be used as are used in the coefficient of linear
thermal expansion inspection.
4.5 Quality conformance inspection. Quality conformance inspection
shall consist of the inspections and tests specified for group A inspection
(table IV), group B inspection (table V) and group C inspection (table VI), as
specified (see 6.2). Requirements for alternate forms of conformance
inspection shall be as identified in the contract (see 6.3.2).
6
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business