MIL-PRF-24792A
TABLE II.
First contract inspection.
Inspection
Requirement
Test
Sample size
Identification and marking
3.4.14
4.6.12
All units
Index of refraction
3.4.10
4.6.9
1/
Water absorption
3.4.13
4.6.11
2/
Connector compatibility
3.4.16
4.6.14
3 connector assemblies
1/ Three specimens shall
be used from units selected at random from the first
contract sample. The
specimens shall be uncured.
2/ Three specimens shall
be used from units selected at random from the first
contract sample. The
specimens shall have been cured in accordance
with 3.4.5.
4.3.1 Sample. The sample submitted shall be a number of units of the
same PIN, sufficient to complete all of the inspections.
4.3.2 Inspection routine. The sample shall be subjected to the
inspections specified in table II, in the order shown. The tests identified
in table II may be performed at the same time as the tests identified in
table III.
4.3.3 Failures.
One or more failures shall constitute first contract
inspection failure.
4.4 First article inspection. First article inspection shall consist
of all the tests listed in table III. The material submitted for testing
shall be representative of the production process.
4.4.1 Sample. The sample submitted shall be a number of units of the
same PIN, sufficient to complete all of the inspections.
4.4.2 Inspection routine. The sample shall be subjected to the
inspections specified in table III, in the order shown.
4.4.3 Failures.
One or more failures shall constitute first article
inspection failure.
5