4.5.1.1 Sampling plan. Group A inspections shall be performed on 100
percent of the product supplied under this specification.
4.5.1.2 Failures. One or more failures shall constitute group A inspection
failure of the sample unit.
4.5.1.3 Disposition of sample units. Samples that have failed group A
inspection shall not be shipped or submitted for group B testing.
4.5.2 Group B inspection. Group B inspection shall consist of the tests
listed in table IV conducted in the order shown. Group B inspection shall be
made on sample units that have passed group A inspection.
TABLE IV.
Group B inspection.
Inspection
Requirement
Test
Workmanship
3.5.9
4.6.8
Appearance
3.5.1
4.6.1
4.5.2.1 Sampling plan. Three sample units shall be selected from each lot
of material supplied under this specification.
4.5.2.2 Failures. One or more failures shall constitute group B inspection
failure of the lot.
.
4.5.2.3 Rejected lots. Requirements regarding the rework of rejected lots
shall be as identified in the contract (see 6.8.1).
4.5.2.4 Disposition of sample units. Samples that have failed group B
inspection shall not be shipped or submitted for group C testing.
4.5.3 Periodic inspection. Periodic inspection shall consist of group C
inspection. Except where the results of these inspections show noncompliance
with the applicable test requirements (see 4.5.3.1.4), delivery of products
which have passed group B shall not be delayed pending the results of these
first article verification inspections.
4.5.3.1 Group C inspection. Group C inspection shall consist of the
inspections specified in table V in the order shown. Group C inspections
shall be made on units that have passed the group B inspection.