MIL-PRF-24794A
6.8
Conformance inspection.
6.8.1 Rejected lots.
If a group B inspection lot is rejected, the
contractor may rework it to correct the defects, or screen out the defective
units (if applicable), and resubmit the lot for inspection.
6.8.2 Noncompliance.
If a sample fails to pass group C inspection, the
contractor must notify the contracting activity of the failure and take
corrective action on the materials and processes, or both, as warranted, and
on all units of product which can be corrected and which were manufactured
under essentially the same conditions, with essentially the same materials,
processes, and which are considered subject to the same failure. Acceptance
of the product will be discontinued until corrective action, acceptable to the
contracting activity has been taken. After the corrective action has been
taken, group C inspection must be repeated on additional sample units (all
inspection tests or the inspection test which the original sample failed, at
the option of the contracting activity). Group A and group B inspections may
be reinstituted; however, final acceptance will be withheld until the group C
inspection has shown that the corrective action was successful.
6.9
Subject term (key word) listing.
Fiber optic connectors
Adhesive
Acrylate
6.10 Changes from previous issue. Marginal notations are not used in this
revision to identify changes with respect to the previous issue, due to the
extent of the changes.
Custodians:
Preparing activity:
Army - CR
Navy - SH
Navy SH
Air Force - 11
NASA - NA
Agent:
DLA - CC
Review activities:
Army - MI, SC
(Project 6070-0005)
Navy - AS
Air Force 02, 13, 19, 33, 93, 99
DLA - CC
11
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business