MIL-PRF-24793A
TABLE I.
First contract inspection.
Inspection
Requirement
Test
Sample size
Identification and
3.5.13
4.6.11
All units
marking
Index of refraction
3.5.9
4.6.8
1/
Water absorption
3.5.12
4.6.10
2/
Splice compatibility
3.5.15
4.6.13
3 splice
assemblies
1/ Three specimens shall be used from units selected at random from
the first contract sample. The specimens shall be uncured.
2/ Three specimens shall be used from units selected at random from
the first contract sample. The specimens shall have been cured in
accordance with 3.5.4.
4.3.1 Sample. The sample submitted shall be a number of units of the same
PIN sufficient to complete all of the inspections.
4.3.2 Inspection routine. The sample shall be subjected to the inspections
specified in table I in the order shown. The tests identified in table I may
be performed at the same time as the tests identified in table II.
4.3.3 Failures. One or more failures shall constitute first contract
inspection failure.
4.4 First article inspection. First article inspection shall consist of
all the tests listed in table II. The material submitted for testing shall be
representative of the production process.
5
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business