MIL-PRF-24793A
in accordance with TIA/EIA-455-5 method B.
The subcycle shall be included in
the test.
4.6.13.3 Fiber pull out. The splice assembly shall be tested by applying a
tensile force of 14.0 N (3.1 pounds) on the 900 µm fiber for one minute.
After the test the splice assembly shall be examined for fiber position using
a profilometer or an optical interferometer.
4.6.14 Particle diameter (see 3.7). The contractor shall demonstrate
conformance with the requirements of 3.7. Filtering of the adhesive material
through a 5-micron absolute filter during the manufacturing process is one
method of demonstrating conformance with the requirements.
5.
PACKAGING
5.1 Packaging. For acquisition purposes, the packaging requirements shall
be as specified in the contract or purchase order (see 6.2). When actual
packaging of material is to be performed by DoD personnel, these personnel
need to contact the responsible packaging activity to ascertain requisite
packaging requirements. Packaging requirements are maintained by the
Inventory Control Point's packaging activity within the Military Department or
Defense Agency, or within the Military Department's System Command. Packaging
data retrieval is available from the managing Military Department's or Defense
Agency's automated packaging files, CD-ROM products, or by contacting the
responsible packaging activity.
6.
NOTES
6.1 Intended use. The adhesive covered by this specification is intended
for use with fiber optic splices or connectors in fixed plant, tactical, and
shipboard applications.
6.2 Acquisition requirements.
Acquisition documents must specify the
following:
a. Title, number, and date of this specification.
b. Issue of DODISS to be cited in the solicitation, and if required, the
specific issue of the individual documents referenced (see 2.1).
c. Type of adhesive packaging required (1 liter HDPE containers or
polypropylene syringes with 4.0 grams of adhesive).
d. Data required (material certifications and chemical certifications).
e. Requirements for test and inspection facilities (see 6.3.1).
f. Requirements for alternate forms of conformance testing (see 6.3.2).
g. Requirements regarding rework of rejected lots (see 6.8.1).
h. Requirements regarding failure of group C inspection (see 6.8.2).
i. Is Material Safety Data Sheet required?
(See 6.7)
6.3 First article. When first article inspection is required, the items
should be a first article sample. The first article should consist of a
10
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business